Long Haired David's blog
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
Rebuilding my Router software to suit me
As I have mentioned, I have been working on a software project to complete my Open University degree. This project was named 470Router - 470 after the code for the OU course - TM470 - and Router as it was intended to be used to create freight car routings for my model railroad. Well, I finished the degree (got a 2.2 and was awarded a B.Sc. Hons) and went off to do other things (mostly building some plastic scale model cars - Gentle Scale Modelling).
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
Building JMRI routes on the S&NE
As I now have a system for car routing and train management, I need to move on and get JMRI working for control of the track. Ideally, I would like have JMRI controlling all of the points and then, as I have a defined set of trains, a route set up for each of those trains.
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
Sunset & North Eastern R.R. - extending the staging
Having finished with the routing software, I found that single line staging at both ends, although it seemed to be OK, wasn't going to work. I decided to make both staging to be double track. This involved the following:
-
Purchasing 2 new switches
-
Purchasing 2 extra switch motors
-
Taking down the old track
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
SNE final track plan
I put my track design on the Model Railroader Track forum for comments and had lots of help sorting out what would work and what wouldn't. There were concerns that I had done the usual trick of overestimating how much track that can be got onto a board and one commenter thought that I had used #2 turnouts to make everything work. In fact I had been a little ambitious but, with a bit of reorganising,I was able to get the basic layout to fit.
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
SNE - joining the foam core together
I have spent the day today connecting everything together. I have planned out the new layout. This has been amply discussed on the Model Railroader Magazine Forum.
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
SNE - Foam Core is down
I have now laid out all of the foam core. It all fits very nicely and very tightly. It is 80mm high to accommodate the DCC Concepts point motors.
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
New Boards for the S&NE
Further issues with my arthritis have caused me to dismantle the layout that I was building on the kitchen units. There were two problems with it. Basically, the return curves were too tight and I was getting a lot of issues with stock coming off the track. Secondly, it required that I stand up to build the railroad and also to do the switching.
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
Blair Line Sam's Roadhouse on the S&NE
I needed a "seedy" building just outside the gates of the freight yard and Blair Line's Sam's Roadhouse seemed to fit the bill. Their description is:
![Long Haired David's picture Long Haired David's picture](https://model-railroad-hobbyist.com/sites/model-railroad-hobbyist.com/files/pictures/picture-11925.jpg)
GC Laser Ice House on the S&NE
My next project after working on the yard area was to get the layout moving again. I hadn't cleaned the rails since I laid the ballast so I knew that there was going to be some issues. I had a cash Christmas present so I spent it on the Woodlands Scenics track cleaning andloco wheel cleaning equipment.
>> Posts index
![RSS - Long Haired David's blog Syndicate content](/misc/feed.png)
Navigation
Journals/Blogs
Recent Blog posts: