Coal and steel rr's blog

O gauge layout update

Lots of work have been Done on the tunnel and scenery.
https://m.youtube.com/watch?v=q0pAetyG9zM

Op session on coal and steel railroad today

Bill and  my grandma came over. We ran 5 trains on prr main line.

Youngstown   freight

prr p  train 1&2 

Signal at lum tower

mth prr Signal bridge and Lionel 151 operating semaphore.

O gauge layout update October 8 ,2015

O gauge layout update September 30,2015 part 1

More work on scenery and Signal.
https://m.youtube.com/watch?v=K-1RkahLKOQ

O gauge layout update September 30,2015 part 2.

More work on scenery and Signal.
https://m.youtube.com/watch?v=ch7QmN_e7ck

O gauge layout update September 25,15

More work on the scenery in the steel mill and Signals at lum are wired.

https://m.youtube.com/watch?v=ciWrvhagPak

Saturday op session on coal and steel rr

Jonah and me had op session. we switched between conductor and engineer. switching New castle have way  through switching new castle the remote stop working. we thick the  Antenna broke in the remote.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: