Coal and steel rr's blog
O gauge layout update September 19, 2015
Work on scenery in the steel mill and more work on wiring the signals
Mth DCS on the coal and steel railroad
just installed DCS on the railroad today.
https://m.youtube.com/watch?v=2l9jLTYDkxU
This is how you run conventional locomotive
o gauge layout update Sep 9, 2015
track, mth dcs and single.
coal and steel railroad op session 8/28/15 part 1
Jonah and me had op session, we switched between conductor and engineer. Main line running and switching at Conway yard. not all was recorded.
coal and steel railroad op session 8/28/15 part 2
Jonah and me had op session, we switched between conductor and engineer.
Switching at Conway yard, Jacob Coal Co and New Castle with crew of extra 475, not all was recorded.
o gauge layout update August 26,2015
Weathering track and working on the signal Bridge
o guage layout update 7/31/15
scenery, track and film on new camera.
Operation session on coal and steel railroad today.
Operation session on coal and steel railroad today with Jon and me, we ran two main line trains and all ove branch line trains.
o gauge layout update July 10, 2015
Worked on some car card and waybill shelves, scenery and track.
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: