ATSF3751's blog

Santa Fe 1st Arizona Sub under construction November 2018 update

Work is progressing on the layout room, with modules now going 2/3 around the room, and only one wall left to insulate and Gybrock (drywall). Meanwhile work on the name trains continues, in an effort to have each car as close to prototype as possible.

Santa Fe 1st Arizona Sub under construction

Hello,

Work is progressing on my Santa Fe 1st Arizona Sub layout. The layout is in my double garage, which is insulated, and Gyprocked (dry-walled for my American friends). The layout is triple decked with the dreaded helix between each level, but that works for me to get the most out of yards and scenery. It is a representation of the Santa Fe mainline between Needles CA and Seligman AZ, 1951-1955.


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: