richhard444's blog
Relocating Watersmeet Engine Terminal on the CNW Part 2
Here are more photos of the Watersmeet Engine Terminal relocation on the CNW
This shows the 10" addition I added at the end of the peninsula, and some of the risers installed in the background
The rest of the risers added at the end of the peninsula and in new add on
Relocating Watersmeet Engine Terminal on the CNW
I am starting this thread to show the relocation process I took to revise and relocate the Engine Terminal at Watersmeet, MI on my CNW Peninsula Div. HO scale railroad. The first series of photos is of the Terminal as it was currently located. Also in these photos is the Watersmeet branch line trackage and some industries. (to be removed)
Paving for Sanborn Lumber Co. Part 2
Part 2:
Buildings set in place
Gluing in the fillers to bring grade crossing pieces to correct height. The small pieces between the rails are .030 styrene and the more rectangular pieces are .060 thick x 1/4" wide shown by the green pencil, but any width would work as long as the space allows it.
Paving for Sanborn Lumber Co. Part 1
Parking lot & access roads for the Sanborn Lumber Co.
Paper templates
Red marked areas are to be removed
Another new building in Ashland Ind. Dist.
The Sanborn Lumber Co. is built and positioned on the layout. It is located in my Ashland Ind. Area. I still need to do the signage, add the details, do the entry driveway & parking lot. It is a Walthers "Walton & Sons Lumber Co." kit. The first three photos are shown below.
My Most Recent Structure Project
What happened to my blog post that I made yesterday? It was showing my most recent building project. That post had to do with the building of the Atlas Middlesex Mfg. kit
My Latest Structure Project
My Latest Structure. It is a Atlas Middlesex Kit.
CNW Peninsula Div. - C. Reiss Coal Co. Update #1
Ground Cover added to .060" styrene sub-base:
Buildings & Fences added:
Ashland Dairy Products
Ashland Dairy Products severe kit bash is finished. It took longer then normal because I took LOTS of pictures as I went along. I will post the pictures of the various steps I went through to get here.
Richard - Superintendent CNW Peninsula Division.
blog - http://mrhmag.com/blog/richard_harden
Starting on the C. Reiss Coal Co. part 1
I have started to complete the C. Reiss Coal Co. ramp & structures for this business in the Ashland Industrial Area on my HO scale CNW - Peninsula Div layout. The first pictures are of the ramp scenery base lead up to the coal trestle.
Foam in place:
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: