William M. Moen Sr.'s blog
How to construct code 83 #4 Dual Guage turnouts
Wed, 2009-07-22 15:52 — William M. Moen Sr.
I am in the process of reconstructing my desert mining RR which ran from Keeler CA/Cero Gordo Mines to Owenyo CA. where there was long transfer trestle and a short loading dock to move freight and ore from the Narrow Guage (Carson & Colorado to the Southern Pacific standard guage. I need the #4 Dual Guage turnouts to make the whole thing work.
Respectfully and with HOPE
Wild Bill
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: