William M. Moen Sr.'s blog

How to construct code 83 #4 Dual Guage turnouts

I am in the process of reconstructing my desert mining RR which ran from Keeler CA/Cero Gordo Mines to Owenyo CA. where there was long transfer trestle and a short loading dock to move freight and ore from the Narrow Guage (Carson & Colorado to the Southern Pacific standard guage. I need the #4 Dual Guage turnouts to make the whole thing work.

Respectfully and with HOPE

Wild Bill


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: