Layout tour

Salt River Valley crew change point/yard - A hidden staging yard out in the open. The SRV Yard project.

Salt River Valley crew change point/yard - A hidden staging yard out in the open. 

The SRV Yard project.

With the expansion of the GS&M I was able to gain a lot of extra space.  The problem is the GS&M was built to fit into its 12'x 20' space. At this time what is the PHX end staging is now reached via a Huge Helix down to the bottom staging level for all the shared staging on the layout (PHX - North & TUC - South).

jmt99atsf's picture

Track Level Ride under the Main Street Bridge

jmt99atsf's picture

Part 2A - The Main Street Bridge Project

Jamie@M160's picture

Scenic Sub Project Update 2 - Layout Space and Staging

The project gets started (and there was much rejoicing..)

Jamie@M160's picture

Scenic Sub Project Update 1 - Introduction

 

AN INTRODUCTION TO THE SCENIC SUBDIVISION PROJECT...

 


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: