Operations
3D Printing of an Interlocking tower - need advice and/or suggestions
I am attempting to create a 3D printed model of an Interlocking in my home town of Vandalia, Illinois. It watched over the crossing of the Illinois Central and the Pennsylvania railroad back in the day. This crossing is going to be part of the signature scene on my model railroad. I thought about trying to scratch build it, but wanted to give 3D printing a try as its the up and coming thing.
An Incredible Resource - April 1990 CN Winnipeg Terminal Car Control Manual
An Incredible Resource
Steve Boyko, recently posted a page from a very interesting document in a Facebook Railfan group I belong to.
The document is the April 1990 edition of the CN Winnipeg Terminal Car Control Manual.
When I saw the post my brain went haywire.
It contains track diagrams and car spot lists, codes, and names, for EVERY CN Customer in Winnipeg in 1990!
**Mind Blown**
Smaller size layout operations
I started operating my Wheeling Freight Terminal about a year ago and have now settled into monthly sessions. The layout represents an area under yard limits so operations tools are a little different. I posted details on handling outbound cars at my blog.
Operation session on coal and steel railroad today.
Operation session on coal and steel railroad today with Jon and me, we ran two main line trains and all ove branch line trains.
Helper Operation Dynamics
In the new issue of MRH Joe Fugate talks about operating long trains with helpers. It so happens that I just finished setting up a train with a steam puller and pusher to demonstrate on my HO layout at the Portland NMRA convention. I have a fairly long (30 ft) 2.2 % grade that I just completed that leads into Cajon Pass Summit. It has curves of 48, 60, and 70 inches. I wanted a train of at least 30 cars and to use BLI 2-10-2's.
Friday Night Group D&H Operations June 2015
Switching preference in the yard
Those of you doing Operations, how do you switch your yards? I was playing today at the club because after 6 hours of making sure the Ops session was ready the turnout was a SPECTACULAR failure. With my switchlists already done though, I lashed an engine to the first two tracks of cars and began shuffling cars into four trains. It's the prototype way, and honestly makes more sense than doing it one train at a time, but the little voice in my head was saying "Gee, Dispatcher needs a train ready to get a crew busy, and you have all of yours...
Coal and steel railroad car card and waybill question
I have three track yards with the list of each train and the industry it serves.
Should I color code my waybill by what train goes on?
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: