Layout maintenance
Help Identifying Switches and other parts in a track plan
Can anyone help identify the switches here I can not figure it out myself and need to know for prices!
A look in the MOW yard: what have I been up to lately?
Here's some shots of my new-ish MOW yard in my bedroom, and what's hangin around.
NMRA MCR division 1 weathering clinic
Part 1 https://m.youtube.com/watch?v=hbeINfvdq6s
part 2 https://m.youtube.com/watch?v=hj_zAWIl9RM
Jim Dufour layout - great episode!
I just watched the current episode featuring Jim Dufour's layout - and I wanted to say "Well done!" to both Jim and Barry for bringing such a great layout to the show. I really enjoyed the segment. I loved hearing about the prep for the open house and it was great to see the connection between railfan George Corey's vintage photos and how Jim has reproduced the scenes on the layout.
Great stuff: Please, bring us more layouts like this one!
Michael Rose's LED Boards - In stock again, and... a STARTER KIT
And we're back with round two; the boards are in stock again, the prices have been lowered back to the original offering price, and we are now offering a starter kit with everything you need to get a demo board up and running.
The starter kit includes the Circuit Board, LEDs, Resistors, and a 75W 24v Power Supply.
Our LED Boards have been a resounding hit with everyone who has installed them.
Check a few of the threads on MRH:
Derailments: snap!
They happen... This one just took place. Bother! I have to secure that roadbed!
Videos of 8111
Here is a posting for my 8111 loco. Any comments should be made on my other forum about 8111, please. Thank you! http://model-railroad-hobbyist.com/node/21812
Cool Shelving Unit
This is a good storage tool you can use a lego tile on top of a lego plate with a two stud gap in the middle example if you use a 4x8 plate you should put the tiles on either edge. Go to this link- http://shop.lego.com/en-US/Pick-A-Brick-ByTheme and search for 4x8 plates and 1x8 flat tiles (those are the largest possible) I recommend layering the plates to make a strong base but it can be as long as you want.
LET ME KNOW IF YOU LIKE IT PLEASE LET ME KNOW
Work continues on the BNML - Lighting
I've finally got taken some time to work on the BNML again. Lets get some light on the situation!
In this thread, I will describe my lighting, beginning with the valance and lighting structure.
- Bill
STATUS:
- January 15, 2016 - The lights are all up! Just need to finish the Valance.
- January 27, 2016 - The valance is done!
Caboose Industries Ground Throws
I would like to know if the Caboose Industries ground throws in HO scale works to operate the O Scale Fastrack turnouts?
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: