Layout tour

rickwade's picture

Hat Cam POV (Point of View) test using my Cube micro camcorder

When I recently was working on the water feature at the base of my Misti Mountain I was disappointed that I couldn't video some of the work as I needed both of my hands to do the job.  After thinking about it I thought that I would try out using my new Polaroid Cube micro camcorder attached to a cap (Notice the name on the cap!).

I just took the cap and clamped on a metal spring clamp.  The Cube has a magnetic base so I just set it on the clamp and started shooting video.  Here's a picture of the rig:

bxmoore's picture

Rob Mallett's Lodi Junction

Some extended SP indulgence that I recently filmed on my friend's developing layout, an imaginary Lodi Junction.

Brian

https://www.youtube.com/watch?v=wctQTd3ZEn0

[Note: I embedded the video in your post for you - Bill]

joef's picture

More January issue sneak peek

Here's another sneak peek from the upcoming cover story on my HO Siskiyou Line, this time a panorama of my Tenmile Creek scene. I've never put the entire scene into a single photo before, so I thought this might be fun to do ... here it is. This photo, and a full-sized 300 DPI panorama you can look at will be in the January issue.

Enjoy ... click on the photo for a larger version.

dave1905's picture

Wilmington Yard

Now that Elsmere Junction is pretty well in, time to move on to Wilmington Yard.  The yard is recycled from my previous layout.  It has a main, runner, 5 yard tracks, a caboose track, scale track and lead.  There were a few industry tracks on the back side of the yard, across the main.  Originally only #1 track was double ended, that has been expanded in the new design to 2 double ended and 3 stub class tracks.  All tracks are class tracks, I don't have designated A&D tracks, but normally the yardmasters use the runner, #1 and now #2.

A day at the Garve and Ullapool Railway part 3

Today I could finish the third part of A day at the Garve and Ullapool Railway.

https://www.youtube.com/watch?v=SCYB-AAabkg

Markus

Winter hit the Inverlael Distillery

Last night the area at Inverlael was hit by a small snow storm. And so today
the crew of the Ivatt had to shunt the snow covered Inverlael distillery.

Winter on the Garve and Ullapool Railway

I wish everyone of you a Merry Christmas and a Happy New Year.
Today I could finish the filming for my A day at the Garve and Ullapool Railway Series.

Markus

German Model Railroad meet. A unique module for Free-Mo?

In the link below you find a German Model Railroad meet from November 2013.  In the N Spur section, first section, about 4:25 in, there is a unique return loop module that is designed to double as hidden or offline staging.  In the video it is holding two trains as a third comes in.  It could probably hold additional shorter trains running DCC.  For guys doing Free-Mo in N scale this would make a unique return loop.  M.C. Is this one to add to your collection?

jmt99atsf's picture

Layout Update - 12 December 2015: Union Station Yard Part 1

This is the update for 12 December 2015. The construction of the layout finally reached the Union Station (aka Kansas City Union Station) yard area in early December. I've left this area to the end because it will have the most complex construction piece, the engine facility in the middle of the east helix. Hopefully over the next couple of weeks, I can get a couple of tracks installed to join the layout from one end to the other. I am in the process of planning the design of the support structure for the engine facility that will be placed in the middle of the east helix.

trainmaster247's picture

My Layout (Yes My Layout!!) First Module Done (and review)

Thanks to Arizona Rock and Mineral my model railroad dream will become a reality. I am doing a product review on their ballast and ground cover which will be featured on my 2'x5' switching layout. Construction will begin Monday and I can't believe it is really happening!!!

The plan:

 


>> Posts index Syndicate content


Journals/Blogs

Recent Blog posts: