Operations
Do you run at scale speeds?
My prototype has a speed restriction of 25mph in place of the entire subdivision that I model.
Nice and slow, see, that's the way.
I was wanting to confirm that my speed was appropriate and so today I picked up a speed calculator app for my iPhone (ModelSpeed).
I discovered that, in fact, I am running too slow. But an actual scale 25mph FEELS too fast. A scale 18mph is much better to me. I'm going to enact the selective compression of time act of 2014 and say my 18mph is 25.
IAIS's West End - Atlantic Spur on a shelf
I've always wanted to model more of Iowa Interstate's approximately two mile long Atlantic Spur, the IAIS schematic of which is shown below:
Dispatching the K&EFR & The mon night mail
Train order working was introduced to the South Australian railway system by W A Webb ex Colorado Midland and the KATY commissioner of railways during the 1920s and remained in use in train order territories well into the 1980s
Run before you're done?
On another thread someone was saying that all too often modelers these days are afraid to run trains until their layouts are finished and perfectly detailed. It was also suggested that this makes a smaller layout preferable to a big one because it takes a loonnnnggggg time to finish a monster layout.
Well, there is certainly some validity to this opinion, but one should never make broad sweeping statements ... (oops... I just made one). I mean, there are often exceptions to the rule(s)...
List of Industries, loads, and car types?
Is there an online resource that lists various industries and the railroad related traffic they use?
Basically I'm looking for a list that I can use to populate my waybills with legitimate traffic.
Ideally this would include
- Shipper (load origin, including city)
- Receiver (load destination, including city)
- Product (what is being shipped)
- Type of car used to move the product
- Bill
What is this? Updated Picture
Found this Bachmann part in a on sale bin. Have a guess as to what its purpose is, just want to confirm it.
Thanks
RJ
Blocking the BNML
I've been working on my blocking schema for the BNML.
I'll be using a modified Car Card system for traffic forwarding that includes blocking codes based on the TIBS concept as published in Model Railroader.
Anyone using a modern work order system for operations?
Just curious to know if anyone out there has implemented a modern prototypical style work order system for switching industries using local trains? I have seen what a class 1 railroad crew uses for for a work order when switching industries in real life. I am thinking I would like to implement a similar system on my own layout over a system like the the car card system.
Jody
Bring wrecking crane to life
Hi All
I have just joined this site after looking for a DCC operational crane such a the old ROCO model.
when I found the article in the mag posted Aug 2012.
Before I go on the hunt for items, can anyone tell me the best place to order the motors etc. in the article.
Regards
Tom
Engine Facility Question
I recently posted this picture of the Atherton engine facility asking if anyone could spot the deliberate error.
>> Posts index
Navigation
Journals/Blogs
Recent Blog posts: